Tinubu Flags off NNPC Limited 350MW Gwagwalada IPP Project | ICB News

Tinubu Flags off NNPC Limited 350MW Gwagwalada IPP Project | ICB News


President Bola Ahmed Tinubu on Friday in Abuja performed the groundbreaking of the 350MW first phase of 1350MW Gwagwalada Independent Power Plant (GIPP) project.

A a statement by his Special Adviser on Media and Publicity, Ajuri Ngelale, reaffirmed President Tinubu’s administration's commitment to strengthening Nigeria's energy sector. 

The project according to the release is in line with President Tinubu’s campaign promise to increase power generation beyond the current 12,000MW, address power value chain challenges, and remove all distribution bottlenecks.

"The GIPP project is led by NNPC Ltd. in a joint venture with China Machinery and Engineering Corporation (CMEC) for the EPC, and General Electric (GE) for the Long Term Service Agreement, and is designed to provide reliable electricity, strengthen Nigeria’s energy sector, and accelerate economic growth.

"The GIPP project will sit on an already acquired 54.7hectares of land in Gwagwalada, Abuja, and is one of the critical power generation projects along the Ajaokuta-Kaduna-Kano (AKK) gas pipeline corridor, Nigeria’s largest ongoing domestic gas pipeline project till date which is at 70% completion" the statement added.

Post a Comment

COMMENT DISCLAIMER: Comments entered here belong to their makers and do not in any way reflect or represent the views of Ife City Blog, its owners or Staff.

Previous Post Next Post